Tuesday, 24 January 2012

Construction - Day 3 of Editing

Our 3rd day of editing came after our 5th day of filming. This is because I felt we did not have enough clips to edit and we had also lost clips so we filmed as much as we could before editing. The 3rd day of editing proved to be one of the easiest. This was due to a lot of footage being filmed and none of the clips being corrupted like previously. All the clips were successfully loaded and ready to edit. This editing day involved me filling many of the blank spaces during the intro of the song. I used the additive dissolve transition for many of the clips as it is a very smooth transition and corresponds with the sombre tone of the song. The only problems that occurred were lip syncing the footage and song perfectly as Michael proved to have some difficulty doing this. However we were able to successfully lip sync the video even though it took a while. In the future we will this process will be easier as we would have time to practice it. After this day of editing we have successfully edited 1min 30sec but non-continuous. Our next days of filming will have involve filling in any blacks that are in our music video.


-BYRAN FERROL-

No comments:

Post a Comment